Excavation of various pile caps and final grade continued this week. Crews worked on clearing remaining soils along the sheet piling to allow Michels to test tieback anchors in Tier 3.
Pipe piling continued to be installed at an excellent rate. With a congested site, each installation is being well-thought out to allow egress and access of other trades. Several pile caps were poured and finished this week, and crews worked on pouring the freight elevator pit, which allowed the placement of the elevator wall forms. The weather was very mild throughout the week, and the sun exposure helped dry out the site.