Precast panels are being set at the Radisson Paper Valley Hotel. At the Exhibition Center, steel stairs are being prepped for installation from the exhibition level to the plaza level.

Concrete footings were formed and poured at the loading dock. Masons are finalizing the west wall of the exhibition hall and have started work on the south wall. They continue placing stone veneer around the elevator shaft walls at West Lawrence Street.