Concrete floors have been poured around the escalator/stair landing area, and steel stairs were installed at the Radisson Paper Valley Hotel.
Concrete footing work continues at the loading dock. Slab on grade prep is taking place for a future concrete floor pour. Masonry work continues on the exterior of the Exhibition Center at West Lawrence Street; masons are placing stone veneer around the elevator shaft walls, as well as working on the floor-to-deck CMU wall along the west side of the exhibition hall.