August 7, 2017 Weekly Update

Structural steel placement has begun at the Radisson Paper Valley Hotel.

Steel at the loading dock has been erected, and steel stairs from the plaza level to the bridge level have been assembled and installed. Loading dock block walls are complete, and masons will begin work on the exhibition hall walls. Slab on grade concrete placement is complete within the west corridor.

Read More (PDF)