This week the onsite construction crew continued removing soils down to Tier 2 elevation. Re-grouting on Tier 1 will be finalized and tested out, with an estimated mid-week completion.
Some of the Tier 2 tiebacks along Lawrence Street were augured into place, which will continue in the coming week. The weather was a mix of below-zero temperatures and rain causing muddy conditions, however the crew was able to keep up with the changes in weather to maintain the site.