This week the onsite construction crew completed all sheet piling except for two areas that will be completed in conjunction with excavation. The fiber line was re-installed by AT&T with no reported interruptions.
Excavation of the second tier of tieback anchors began last week, and work continued on auguring and installation along Elm Street. Rain and warmer temperatures caused muddy conditions and flooding on the jobsite, but the crew was able to complete the scheduled work for the week.