Foundation work to support the structural steel for the walkway bridge continues at the Radisson Paper Valley Hotel.

Steel erection for exterior stairs on the east side of the project also continues. Steel decking for the stair slabs is in place, and canopy roof decking was installed. A storm water expansion tank slab was poured this week. Masons began working on freight elevator CMU walls and loading dock walls. Site conditions are good and there were no injuries this week.