October 30, 2017 Weekly Update

Elevator installation and escalator finishes are ongoing, and interior stud framing and drywall will begin soon at the Radisson Paper Valley Hotel.

The entire exhibition floor has been poured, and sub-grade is being prepped in front of the loading dock. A slab has also been poured in the walk-in cooler.

Read More (PDF)