Roof blocking, exterior framing, and precast work continues at the Radisson Paper Valley Hotel.
Following completion of the bridge steel, the crosswalk slab was poured and steel decking was installed on the crosswalk roof. Slab on grade preparation continues with the installation of floor boxes and site grading. Masons have begun work on interior stone veneer around the elevator shaft walls. Site conditions were good this week.