September 25, 2017 Weekly Update

Exterior framing and precast work continues at the Radisson Paper Valley Hotel.

Installation of miscellaneous steel is in progress, and expo slab-on-grade preparation continues with the installation of floor boxes and site grading. The south third of the expo hall floor has been poured and finished. Interior stone veneer continues to go up around the elevator shaft walls in the bridge level area.